跳至内容

Add option to show component in MPS

Controls visibility of components in the MPS
85.91 € 85.91 € (不含税)
US$ 100.00 (不含税)

  • Versions
条款及条件细则
30 天退款保证
送货:2 至 3 个工作天

ODOO'S FUNCTION

In production planning using Master Production Schedule (MPS), not all components in a Bill of Materials (BoM) are relevant at the MPS level. Some components (e.g., small accessories or non-critical parts) may be unnecessary to forecast individually, and including them clutters the view, making planning inefficient.

CLUEDOO'S FUNCTION

1️⃣ Introduces a new checkbox "Add in MPS" in the Component Category form.

2️⃣ Controls visibility of components in the MPS:

  • If the checkbox is checked, components under that category will appear in MPS.
  • If unchecked, those components will be excluded from MPS, even if included in BoM.


1. Create or choose a product > Bill of Materials > Add components and choose the Component Category

Note: both the product and the component(s) must be storable products

2. In the Component Category, you can choose whether this component appears in the MPS or not by checking/unchecking Add Component in MPS

3. Add your product and its BoM to the Master Production Schedule > You will see the finished product and only the component lines with Add Component in MPS checked