跳至内容

Mandatory task in timesheet

The module ensures that when users create a timesheet linked to a project, they are required to specify a task before saving the entry
42.96 € 42.96 € (不含税)
US$ 50.00 (不含税)

  • Versions
条款及条件细则
30 天退款保证
送货:2 至 3 个工作天

STORY BEHIND THE FEATURES

ODOO BEHAVIOR

In the default Odoo workflow, users can log time on a project without assigning it to a specific task, which may lead to inconsistencies in reporting and tracking work progress.

CLUEDOO BEHAVIOR

By enabling the "Mandatory Task" setting, the module ensures that when users create a timesheet linked to a project, they are required to specify a task before saving the entry

CLUEDOO RECOMMENDATIONS

Install on 100% of the database.


HOW TO USE THIS MODULE ?

1. Go to Setting > enabling the "Mandatory Task" in setting

2. Create a timesheet linked to a project; they are required to specify a task before saving the entry

3. It applies to all views (kanban, list, grid)